***Updated on 12/11/2024 at 3 p.m.***

Goucher Street

Notices Related to the Boil Water Advisory for The Week of 12/9 to 12/13

Update on the Boil Water Advisory:  For all residents on South Oak Avenue or on Goucher Street south of Barney Alley, the tests for those water lines show no indication of contamination. The boil water advisory is being lifted for those 2 areas. For residents that live on Goucher Street north of Barney Alley, the Boil Water Advisory would have begun today (12/11) after your water was shut off this morning. Tomorrow’s (12/12) shut off is expected to affect any water customers on Goucher Street north of Church Avenue, and anyone to the East of Goucher Street.  Final test results for all affected areas should be received by Friday (12/13), at which point the City will notify all water customers. Thank you for your patience!

Construction Notice

Work on Goucher Street is coming to a close. The contractor is getting ready to test the new waterline. When the new waterline passes all of the required testing and is ready to be connected, the “tie-in” work will begin. When your new waterline is ready for connection, you’ll receive a notice that your water will be temporarily turned off (likely for a few hours at the most). During that time your water line will be reconnected to the new waterline. When your waterline is re-connected, please run cold water through either an outside faucet, or your bathtub, until the water appears clear and clean. Waterline work generally stirs up things that have settled in waterlines, which will then plug the filters on your sink or hot water heater.

Regarding the condition of Goucher Street itself, the City has good news. There was sufficient funding remaining in the grant to re-pave Goucher Street for the entire length of the waterline replacement work. In anticipation of that upcoming work, the City will only have limited surface restoration completed along Goucher. We anticipate the paving work occurring in the Spring.

Important Notice – 09/27/2024

During the months of October and November, the City’s hired contractor will be installing a new waterline in Goucher Street, south of Nursery. This work will require portions of the road to be closed temporarily everyday between the hours of 7:30 a.m and 5 p.m. The excavation and construction will be starting at the South end of Goucher working north toward Nursery Street. south of Barney Alley, there is no possible detour. please expect up to a 20-minute delay in travel. Once work has moved North of Barney Alley, a detour on Jellison Avenue will be established and the road will be open to local traffic only. If you have any specific travel accommodations (i.e. doctor’s appointments) that you need or would like to request, please reach out to City Hall with the date and time of your travel. We sincerely apologize for any inconvenience.


Reservoir Line

The City’s connection to the water reservoir is currently served by an 8-inch Asbestos Cement (AC) pipe from the 1960s. This project is upgrading that connection to a 12-inch C900 (PVC) line. This upgrade will provide a much stronger and more reliable connection to the City’s water reservoir. As of September 13th, the waterline is largely in place and now just needs to be connected so that the old line can be abandoned. In order to make that connection, the line will have to be shut off.

Important Notice – 09/17/24

On September 19th, the City will need to shut off the waterlines leading to the reservoir so that the new waterlines can be tied in. For those customers living on Merlot Street, Jellison between Rosedell and Rice, or Rice Lane east of Merlot, the water will be disconnected. For the rest of the City, the system will be functioning without the reservoir and so some small pressure fluctuations may occur. If you experience unexpected issues on Thursday or Friday please let us know by calling City Hall. We apologize for any inconvenience this may cause. The City is working hard to improve the resilience of its water system.